Step 1: Mount the end launch connector on the board in the desired position.
Step 2: Ensure the launch pin is centered on the trace.
Step 3: Ensure the transition block is tight against the board.
Step 4: Tighten the 1-72 mounting screws to 20 in-oz torque*, or until the connector is secure.*Suggestion only. Torque amount may vary depending on PCB material.
Step 5 (Optional) : Solder the launch pin to the trace. (Note: Be sure the solder flows the entire length of the launch pin/trace contact area.)
Step 6 (Optional) : Remove any excess solder. (Note: Excess solder will affect performance.)
Step 7 (Optional) : Clean any flux or other residue from around the solder joint.